Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Peeling Paint Colour:N/A Timber stockyard rails lean and

SKU: 70016332601

4.5
EUR100.00 EUR147.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 13 - Aug 18

Live Spec

Peeling Paint Colour:N/A Timber stockyard rails lean andPaint peeling from a wall inside the engine house at Elrington Colliery, near Abernethy, NSW. The negative impressions left in the surface mirror the exact shapes of the sections that have come away. BHP Collieries built this surface infrastructure between 1925 and 1930 to supply coal to the Newcastle steelworks. Part of the Elrington Colliery series.

Store: schmucketriebe.at · Domain: schmucketriebe.at

Description

Timber stockyard rails lean and split beside a collapsed weatherboard shed

Desks and open books sit where classrooms once ran through eight years of operation before the coal economy made them redundant

The building was constructed in 1967 as a purpose-built television set for the production of Skippy the Bush Kangaroo

Railway Corridor at Rozelle

Peeling Paint Colour:N/A Timber stockyard rails lean andPaint peeling from a wall inside the engine house at Elrington Colliery, near Abernethy, NSW. The negative impressions left in the surface mirror the exact shapes of the sections that have come away. BHP Collieries built this surface infrastructure between 1925 and 1930 to supply coal to the Newcastle steelworks. Part of the Elrington Colliery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products