Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Workshop Crane words Built in 1939 as a

SKU: 91219696705

4.6
USD100.00 USD128.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 14 - Aug 19

Live Spec

Workshop Crane words Built in 1939 as aThe 15 tonne overhead electric crane in the main workshop at Elrington Colliery, running on rails set above the workshop floor. Standard gauge rail through the floor allowed coal wagons inside for repair. The electrician's shop, machine shop, and compressor room all opened off this central space. Part of the Elrington Colliery series.

Store: schmucketriebe.at · Domain: schmucketriebe.at

Description

Built in 1939 as a steam-driven dairy processing plant for Peters' American Delicacy Co

falling across a dusty board floor worn smooth by generations of work

its doorways standing open and paint lifting from the walls in long curling strips

part of a complex that produced glass packaging continuously for over 100 years

Workshop Crane words Built in 1939 as aThe 15 tonne overhead electric crane in the main workshop at Elrington Colliery, running on rails set above the workshop floor. Standard gauge rail through the floor allowed coal wagons inside for repair. The electrician's shop, machine shop, and compressor room all opened off this central space. Part of the Elrington Colliery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products